Friday, October 30, 2009

Slow Progress in October '09


Stamped front porch

Septic system being installed in the mud

This hole is about the width of our back yard. Our ground wouldn't perk so we had to do the septic system a lot different.

The dug out pond

"Hey we have water to play in again, yeah"

Back of the house, getting the floor on

the garage floor is getting so smooth

Brandyn checking it out

rooms in lower level

Danny Steenhoek and Scott De Prenger put the Geo Thermal in

back of house being framed up

The garage floor poured and being trowelled

Kevin stamping the front porch

Rick holding up progress

The actual stamps they used. We will also stamp the sidewalk to the driveway and the patio down below next year after the ground has settled.

Walking across the pond, I wonder how long it will take to fill up.

In the lower level checking out some inside walls

The power box is hooked up

Not sure why this picture was taken but it is a nice setting of the sun